17 July 2013. Yard modules. Track laid down and wiring started. As the layout has 2 separate loops which appear as double track, the layout is wired with 2 bus wires. DC power will be used initially, but wiring it this way means one loop could support DCC control while the other loop remains DC. There is not track connection between the 2 circuits either. 2 days of wiring with the help of John and Grant.
Edited by: Russell on 24/07/2013
Optimized for Broadband (Login for Dialup Optimization)
24/07/2013, Russell