5 July 2013. Outside in the sunshine the 2 yard modules were setup on there legs. After the cork was set in place, a basic track plan had been devised and marked on the cork. After removing the track I used a spray can of matt gray along the cork to simulate the track road bed. After this I'll lay the track and wiring for operation and paint the back boards.
Edited by: Russell on 24/07/2013
Optimized for Broadband (Login for Dialup Optimization)
23/07/2013, Russell