Bay of Plenty Trackgang

New Zealand


Username: [] Password: [] [] Forgot Password?

<<Previous | Next>>

17 July 2013 Tunnel Module. Baic scenic work down. Plaster road smoothed and painted. Tunnel portal made of styrene, painted and installed. Track down. Table top painted and installed. Front edge painted in satin black.

Edited by: Russell on 24/07/2013

Optimized for Broadband (Login for Dialup Optimization)

24/07/2013, Russell