15 June 2013 Bridge Module. Once things were tidy, the foam block brigade glued on some hill forms. The river floor just needed painting to seal up before foam block banks were to be done.
Edited by: Russell on 24/07/2013
Optimized for Broadband (Login for Dialup Optimization)
23/07/2013, Russell