Bay of Plenty Trackgang

New Zealand


Username: [] Password: [] [] Forgot Password?

<<Previous | Next>>

15 June 2013 The Bridge Module. A start is made on the bridge module. With help from Grant and his jigsaw the river opening and associated frame changes were cut out. With the front frame cut out reinstated underneath, a new floor for the river was framed in.

Edited by: Russell on 24/07/2013

Optimized for Broadband (Login for Dialup Optimization)

23/07/2013, Russell