Bay of Plenty Trackgang

New Zealand


Username: [] Password: [] [] Forgot Password?

<<Previous | Next>>

17 July 2013 Bridge Module. Basic scenic work done. Added catch rails to bridge made from 1mm square styrene. Temporary bridge to be cobbled together with some scrap pieces of wood, ready for the show.

Optimized for Broadband (Login for Dialup Optimization)

24/07/2013, Russell