Mar 2024. Trackgang beach module. Basic ground form and colour taking shape. Plaster is pre-coloured first and then applied. Ground and backdrops are painted with Resene test pots.
Optimized for Broadband (Login for Dialup Optimization)
10/11/2024, Russell