Bay of Plenty Trackgang

New Zealand


Username: [] Password: [] [] Forgot Password?

<<Previous | Next>>

April 2021. Detail was added to the viaduct and surrounding scenery of the modules. The handrailing and walking planks were added to the bridge. The gorge received more tree cover on the banks and gravel and rocks in the river bed.

Optimized for Broadband (Login for Dialup Optimization)

11/12/2021, Russell