June 2012
Double Dixies. 2629 and 2619 out of the box for some final detail work before Railex Palmerston North. Glazing and crew needed in 2629
Optimized for Broadband (Login for Dialup Optimization)
04/08/2012, Russell
BoP Happenings 2012 - Random pics of activity
Select a thumbnail from below
June 2012
Double Dixies. 2629 and 2619 out of the box for some final detail work before Railex Palmerston North. Glazing and crew needed in 2629
Optimized for Broadband (Login for Dialup Optimization)