February 2019. A start made on building the bridge for the new scenic nz120 modules. Based on the Mangatururu Viaduct, a line drawing was printed from the computer. Styrene construction was pinned and then glued over the plan as per model aircraft procedures. This was repeated for the 4 girders needed.
Optimized for Broadband (Login for Dialup Optimization)
10/03/2019, Russell