Bay of Plenty Trackgang

New Zealand


Username: [] Password: [] [] Forgot Password?

<<Previous | Next>>

February 2019. A start made on building the bridge for the new scenic nz120 modules. Based on the Mangatururu Viaduct, a line drawing was printed from the computer. Styrene construction was pinned and then glued over the plan as per model aircraft procedures. This was repeated for the 4 girders needed.

Optimized for Broadband (Login for Dialup Optimization)

10/03/2019, Russell