Feb 2023. After the Tauranga show we decided that butt joints would speed up assembly and dismantling the layout at shows. First of all was removing the track, then leveling the base. Once clamped the hinge join was added to the front as shown in the pic. After this the track is realigned right through and then cut. 3 module pairs are already built this way so now its time to retro-fit the rest of the modules.
Optimized for Broadband (Login for Dialup Optimization)
10/11/2024, Russell