ECMT Apata bridge 48 rebuilding 12/03/2011
The first pier at the western end of the bridge looks like your standard arrangement used commonly on the NZR. In the grass and dirt is a horizontal brace across the piles.
Optimized for Broadband (Login for Dialup Optimization)
12/03/2011, Russell